Yantong Expressway YT-RG3 Project
Author: Xiang Yang
First Part: Establishment of Quality Assurance Organization
1. Quality Assurance System Network Diagram (see attached table)
2. Explanation:
The Project Manager is responsible for the overall management, adjustment, and control of the five major project objectives and the three key factors of manpower, finance, and materials;
The Chief Engineer of the project mainly focuses on controlling and ensuring the technical plans, progress schedules, engineering quality, and cost of construction;
The Deputy Project Manager is in charge of the comprehensive management, adjustment, and control of the five major objectives and the three key factors of manpower, finance, and materials for sections of the project;
The Engineering Department is responsible for quality control, progress monitoring, construction planning, technical argumentation, and technical documentation;
The Contract Department handles contract management, measurement management, and cost analysis;
The Machinery and Material Safety Department oversees machinery, material management, and safety;
The General Affairs Office manages office affairs, public relations, and logistics support; while the Finance Department controls funds and performs cost accounting;
The Central Laboratory conducts various self-inspection and random sampling tests, provides self-inspection materials for each sub-item of the project, and ensures quality;
The Director of the Construction Section is responsible for the construction and deployment of embankments or structures at different locations and their management;
The Technical Director of the Construction Section is responsible for quality control and technical guidance for each construction section.
Attached List of Responsible Persons:
Project Management Department - Manager: Xu Jianxin
Project Management Department - Chief Engineer: Xia Shangcheng
Project Management Department - Deputy Manager: Ji Guoqing
Project Management Department - Deputy Chief Engineer: Yu Weiguo
Quality Inspection Department:
- Central Laboratory Director: Qin Jianjie
- Surveying Department Director: Zhang Wei guo
Embankment Section One:
- Director: Ji Xuejun
- Technical Director: Zhou Zhengguang
Embankment Section Two:
- Director: Lu Dongsheng
- Technical Director: Zhao Fei
Embankment Section Three:
- Director: Sun Zhigang
- Technical Director: Qiao Yanlin
Embankment Section Four:
- Director: Shan Guangliang
- Technical Director: Zhang Xiaofei
Embankment Section Five:
- Director: Gu Xiang
- Technical Director: Tang Yifeng
Embankment Section Six:
- Director: Chen Zhibing
- Technical Director: Guan Rongchun
Bridge Section One:
- Director: Ni Xi Hu
- Technical Director: Xu Jichun
Bridge Section Two:
- Director: Xia Jianhua
- Technical Director: Jiao Feng
Bridge Section Three:
- Director: Zhu Lei
- Technical Director: Ding Xiaoyong
Bridge Section Four:
- Director: Li Zhong
- Technical Director: Liu Yu
Bridge Section Five:
- Director: Shao Yonglin
- Technical Director: Ji Kejun
Small Structures Team One:
- Captain: Xu Xiaoqing
- Technical Director: Chen Junzhong
Small Structures Team Two:
- Captain: Huang Chunhua
- Technical Director: Li Yiming
Small Structures Team Three:
- Captain: Tang Guiquan
- Technical Director: Yang Guocai
Small Structures Team Four:
- Captain: Yan Zhiming
- Technical Director: Shao Delin