The original 66 kV Asbestos Mine Substation of the Dalian Development Zone Power Supply Bureau will withdraw from system operation due to backward equipment. The newly built 10 kV Jinyuan Switching Station has started construction recently. The power construction following the development and construction steps of the Development Zone begins to "discard the old and absorb the new".